Blast Furnace II
De March of History
Révision de 10 juin 2015 à 01:15 par Gilles (discussion | contributions)
The Blast Furnace II is a building.
Prerequisites
This building is an improvement of the Blast Furnace. It therefore requires the latter to be built.
The creation of the Blast Furnace II is only possible if the technology Rolling-Mill has been enabled in the province.
Costs
This building requires 36500 man-days
The construction of the building requires 3 political points, 8,000 gold, 20 wood, 30 iron and 20 tools.
Benefits
The Blast Furnace II has an improved production of the manufactoring of tools over the Blast Furnace.